Case Studies

Case Studies

Engineering cases from real magnetizing and inspection projects — the customer’s actual constraint, the configuration we specified, and what changed on the line. Written by the engineers who built them.

Case Study 01

From One-at-a-Time to 8–10 Parts per Minute: Building a 100 % Inspection Line for a Canadian Magnet User

A Canadian magnet user replaces manual handling with automatic feeding, measurement, classification and closed-loop correction at 8–10 parts per minute.

Read the case study →

Case Study 02

Re-magnetizing Sm₂Co₁₇ Magnets Inside a PEEK-Overmolded Impeller

Injection molding leaves Sm₂Co₁₇ weak. How to re-magnetize finished, encapsulated parts without opening them — fixture, pulse profile and per-pole verification.

Read the case study →

How to read these cases

Each case follows the same order: the constraint the customer started with, the configuration that was specified to meet it, and what changed on the line once it ran. The constraint is always a production problem rather than a specification — a throughput ceiling, a reject rate, a step that could only be done by hand. The configuration is described in terms of fixture, power supply and measuring method, because that is the order in which the decisions have to be made. What changed is the part that matters: cycle time, repeatability, or the ability to prove the result on every part instead of sampling it.

Two different entry points

The two projects below entered from opposite ends. The inspection case started from a quality requirement: every part had to be measured rather than sampled, and that requirement turned a manual step into an automated line. The impeller case started from a process problem: the parts were already encapsulated when it became clear that the magnetic state was not what the application needed, and they could not be opened again. One case is about measuring every part; the other is about reaching a magnet that is already sealed inside another material.

If your case is not here yet

Two cases are not a catalogue — they are the two projects we have documented in full so far. If your situation involves a different geometry, material family or inspection method, both cases still show how the work is structured: the constraint is written down first, the fixture follows from it, and the measuring method is agreed before the line is built. That sequence does not change with the part.

Have a similar constraint? Send the part, the acceptance window and the cycle time you need — we will tell you whether the line can be built and what the measuring method has to be. sales001@jhhsmag.com
Scroll to Top
RFQ